Contribution of infrastructure on CT growth - M. Burkhardt (UIRR) 17/04/07

< Back to list
Preview

The BRAVO project was concluded by means of a conference which took place on 17 and 18 April in Munich.

Different discussion panels had been organized, above all one panel about infrastructure und rail interoperability which was moderated by UIRR.

In his contribution, Mr. Burkhardt presented the analysis on the rail infrastructure between Munich and Verona (main Brenner corridor) carried out in 2005. This analysis compared the latest offers for accompanied and unaccompanied CT services with the current infrastructure, enabling to determine existing bottlenecks.

Related documents
Slides EN
Top