ATO-terminal starts test phases with night operations 13/09/24
< Back to listSource: https://www.flows.be/transport/2024/09/ato-terminal-start-eind-september-testfase-met-nachtoperaties
ATO terminal to start test phase with night operations at end of September
Intermodal terminal operator ATO will start night operations on Quay 364 in the Port of Antwerp on 29 September 2024. This is a test phase in view of the increasing congestion due to road works.